This was the third MIP log done on site. This log was completed up-gradient from the second log. This location is elevated due to 10-12 feet of fill dirt.

  • Electrical Conductivity log shows a finer grain material from 0-25 feet dropping to a larger grain material and continuing until refusal at 80 feet.
  • Contamination begins at 23 feet and ends at 68 feet on the MIP ECD log.
  • Trapping results confirm the MIP log with TCE and 1,1,1 TCA being most prevalent.
[Log Data]